In Oklahoma City, roof drainage codes are based on the 2018 International Building Code (IBC) and International Residential Code (IRC). These regulations ensure water from roofs is properly collected, directed, and discharged to prevent damage, flooding, and structural issues. Key points include:

- Primary Systems: Gutters, downspouts, and roof drains must handle a 100-year hourly rainfall rate. Proper slope and material standards are required.
- Secondary Systems: Overflow systems are mandatory for backup and must handle up to 10.2 inches of rainfall per hour. They must operate independently of primary systems.
- Residential Requirements: Roof slopes vary by material (e.g., 2:12 for asphalt shingles). Double underlayment is required for lower slopes, and drip edges must be installed.
- Commercial Standards: Larger roofs need independent primary and secondary drainage systems, with detailed calculations signed by a licensed engineer.
- Floodplain Rules: Properties near FEMA floodplains face stricter requirements, including additional permits and reviews.
These codes aim to protect properties from Central Oklahoma’s severe weather. Compliance requires thorough planning, proper materials, and expert guidance. Partnering with experienced professionals ensures your drainage system meets all local standards.
Understanding International Plumbing Code 1106 Storm Drainage Sizing
Core Roof Drainage Code Requirements in Oklahoma City
Oklahoma City follows the 2018 International Residential Code (IRC) and International Building Code (IBC) to regulate roof drainage systems. These codes ensure water is properly collected, directed, and discharged for all building types, covering both residential and commercial properties.
Primary Drainage Systems
Primary drainage systems include gutters, downspouts, internal roof drains, and scuppers, all designed to move water off the roof efficiently. These systems must be sized to handle the 100-year hourly rainfall rate to account for extreme weather. Rainwater must be directed to approved disposal locations that keep water away from the building.

Horizontal drainage piping must maintain a consistent slope – typically between 1/8 and 1/4 inch per foot, depending on pipe diameter – to ensure proper water flow. If vertical walls divert water onto the roof, 50% of the wall area must be added to the projected roof area when calculating drainage capacity. Additionally, overflow systems are a required backup for primary drainage.
Overflow Drainage Systems
Secondary drainage systems act as a safeguard when primary drains are blocked. These systems are mandatory for roofs with perimeter features like parapet walls that could trap water. In Oklahoma City, overflow systems must be designed to handle a rainfall rate of 10.2 inches per hour, which is much higher than the requirements for primary systems. Overflow systems must operate independently, with separate piping and discharge outlets.

The discharge points should be above ground and easily visible to building occupants or maintenance staff, offering a clear signal when primary drains fail. Overflow scuppers must have a minimum opening size of 4 inches. Furthermore, the roof structure must be engineered to support the maximum depth of ponding water, assuming all primary drains are completely blocked.
Waterproofing and Related Code Requirements
Waterproofing plays a critical role in preventing water intrusion and works hand-in-hand with drainage systems. Roof drains should be installed according to manufacturer guidelines, with the roofing membrane properly flashed and trimmed to prevent obstruction. Flashing and trimming around drain bodies should also stop water from bridging.

Parapet wall and overflow scuppers must adhere to the positioning requirements outlined in International Building Code Section 1503.4. For buildings in flood-prone areas, additional measures are required: enclosed areas below the lowest floor must allow automatic equalization of hydrostatic flood forces by permitting floodwaters to enter and exit. One universal rule applies: stormwater cannot be drained into sewers designated solely for sewage.
Residential Roof Drainage Requirements
Oklahoma City follows the 2018 International Residential Code (IRC) for one- and two-family homes, as well as townhouses. This code, effective March 1, 2024, sets standards to ensure water drains efficiently from roofs, preventing pooling or structural damage. Below, we break down the key requirements, from slope specifications to necessary permits.
Minimum Slope and Drainage Path
To ensure proper drainage, roofs must either slope adequately or include roof drains at low points. The minimum slope varies by roofing material:

- Asphalt shingles need a 2:12 pitch (2 inches of vertical rise for every 12 inches of horizontal run).
- Clay and concrete tiles require at least a 2.5:12 pitch.
- Metal shingles must not be installed on slopes below 3:12.
For slopes between 2:12 and 4:12, double underlayment is mandatory to provide additional protection.
| Roofing Material | Minimum Permitted Slope | Underlayment Requirements |
|---|---|---|
| Asphalt Shingles | 2:12 | Double underlayment for 2:12 to < 4:12 |
| Clay & Concrete Tiles | 2.5:12 | Double underlayment for 2.5:12 to < 4:12 |
| Metal Roof Shingles | 3:12 | Follow manufacturer’s guidelines |
Flashing is another critical element, required at all roof and wall intersections, slope changes, and around openings. For chimneys or penetrations wider than 30 inches, a cricket or saddle must be installed to redirect water effectively.
Gutters, Downspouts, and Drip Edges
Proper slope is only half the battle – gutters, downspouts, and drip edges are essential for directing water away from your home. Gutters and downspouts should discharge water onto flat areas like lawns or streets to avoid foundation damage.

For shingle roofs, drip edges must be installed along both the eaves and rake edges. These should extend at least 1/4 inch below the roof sheathing and 2 inches onto the roof deck. An exception applies if a 1×2-inch shingle mold is used, with the starter shingles extending 1/4 inch to 1 inch beyond the fascia.
If your roof includes features like parapet walls that might trap water, secondary emergency overflow drains or scuppers must be installed. These should be positioned 2 inches above the roof’s lowest point to provide a failsafe drainage route.
Reroofing Permits and Inspections
In Oklahoma City, reroofing projects over 500 square feet require a permit. During the review process, the City Engineer – serving as the Local Floodplain Administrator – evaluates runoff calculations and drainage plans before issuing a permit. Properties within 200 feet of a FEMA-designated floodplain must also obtain a Floodplain Activity Permit, which includes additional engineering reviews.

"Prior to authorization of any building permit by the City, the City Engineer shall review all such stream flow and runoff calculations as required under the terms of this chapter and the DCM."
- Oklahoma City Municipal Code § 16-2
Final drainage plans submitted for review must be signed and sealed by a Professional Engineer licensed in Oklahoma. Notably, nonprofit organizations building or remodeling homes for low-income families are exempt from building permit fees. These permit and inspection requirements ensure drainage systems meet the necessary safety and performance standards, giving homeowners peace of mind. Partnering with knowledgeable contractors familiar with these rules is key to keeping your reroofing project compliant from start to finish.
sbb-itb-f94da89
Commercial and Multifamily Roof Drainage Requirements
When it comes to commercial and multifamily buildings, drainage systems are subject to stricter design and inspection protocols compared to residential properties. In Oklahoma City, these buildings must adhere to the International Building Code (IBC) and International Plumbing Code (IPC), with drainage standards tailored to accommodate larger roof areas and higher occupancy demands.
Design Precipitation Rates and Sizing Calculations
For commercial and multifamily properties, primary drainage systems must be designed to handle a 100-year hourly rainfall rate, while secondary systems should account for 10.2 inches per hour. If vertical walls channel water onto the roof, 50% of the wall area must be added to the total projected roof area during calculations.

All drainage designs and calculations must be signed and sealed by a Professional Engineer licensed in Oklahoma before being submitted for city review. The City Engineer evaluates these plans as part of the permitting process to ensure they comply with the Oklahoma City Drainage Criteria Manual (DCM).
| Pipe Size (inches) | Vertical Drain Capacity (gpm) | Horizontal (1/4 in. slope) Capacity (gpm) |
|---|---|---|
| 2 | 34 | 31 |
| 3 | 87 | 79 |
| 4 | 180 | 163 |
| 5 | 311 | 234 |
| 6 | 538 | 487 |
These figures guide the design of both primary and secondary drainage systems, ensuring they operate effectively under various conditions.
Primary and Secondary Drainage Systems
Commercial roofs are required to have both primary and secondary drainage systems, and these systems must function independently with separate inlets and outlets. This redundancy ensures that a failure in one system won’t compromise the entire drainage setup.
Secondary drains play a critical role in preventing water buildup. They must discharge above ground in a visible location and should never reconnect to the primary system. For roofs with parapets or similar barriers, secondary drainage requires a minimum 4-inch opening.

Additionally, roofs must be designed to handle the maximum possible depth of ponding water in case all primary drainage pathways are blocked. Controlled flow roof drainage systems have specific requirements: roofs up to 10,000 square feet must have at least two drains, while larger roofs require a minimum of four.
Proper slope is essential for horizontal drainage pipes. Pipes measuring 3 to 6 inches in diameter need a slope of 1/8 inch per foot, while pipes 8 inches or larger can function with a slope of 1/16 inch per foot. Stormwater must always be directed away from sanitary sewer systems.
Inspection and Compliance for Commercial Properties
Before issuing permits, the City Engineer reviews stream flow and runoff calculations to ensure compliance with DCM standards. During construction, inspections focus on proper placement relative to floodplains and test the performance of conductors and storm drains under pressure, as outlined in IPC Section 312. Cleanouts must remain accessible and unobstructed for routine maintenance.

Independent operation of primary and secondary systems is crucial. Inspectors verify that both systems meet all safety and design standards. For properties utilizing sumps and pumping systems, the sump pit must have a removable cover for easy inspection and repair.
Regular monitoring of secondary drain discharge points is essential. Water flowing from these outlets signals a blockage or failure in the primary system that requires immediate attention.
How to Ensure Compliance
Steps to Meet Code Requirements
To stay compliant with local regulations, start by verifying the applicable codes, including the 2018 IRC and any local IPC amendments. Use the current Oklahoma City Drainage Criteria Manual (DCM) as your guide. Ensure that all plans are thoroughly reviewed, signed, and sealed by a licensed Professional Engineer. Before building permits are issued, the City Engineer will evaluate all stream flow and runoff calculations. It’s also critical to have your engineer calculate the maximum depth of water the roof can handle if all primary drainage systems become blocked. Additionally, check whether the project is located within 200 feet of a FEMA-designated floodplain.

Make sure drainage components align with manufacturer specifications. Roofing membranes must not obstruct drain openings, and installation should strictly follow the manufacturer’s guidelines. If roof perimeter construction could trap water, independent overflow systems are required. These secondary systems must discharge above grade in an area where the flow is easily visible to occupants or maintenance staff.
Local Climate Considerations
Oklahoma’s intense weather conditions demand drainage systems capable of handling extreme situations. Primary drainage systems should be designed for a 100-year hourly rainfall rate, while secondary systems must handle 10.2 inches of rainfall per hour. These benchmarks ensure roofs can withstand the heavy storms typical in Central Oklahoma.

Roofs must also support the maximum depth of ponding water, even if primary drainage fails. Use durable, code-approved materials such as cast iron, ABS, or PVC SDR26/SDR35 to handle the region’s weather challenges. During severe storms with high winds and hail, it’s essential to secure gutters, downspouts, and scuppers properly. Scuppers must have a minimum opening size of 4 inches to avoid blockages. Given these rigorous standards, collaborating with knowledgeable professionals is crucial.
Working With Experienced Contractors
To navigate these demanding requirements, it’s vital to partner with experienced local contractors who understand the latest updates to drainage and flood control ordinances. Failing to comply could result in Class "A" or "B" offenses under municipal code.
Contractors like Arrowhead Roofing, with decades of experience in the area, can help ensure compliance while coordinating engineering details precisely. Their thorough inspections can identify potential issues with drainage, ventilation, and insulation before they escalate into costly structural problems. Local expertise ensures that both code requirements and manufacturer guidelines are met, safeguarding your investment.

"Review and approval of the plans by the City shall not relieve the Engineer of responsibility for all aspects of the design included as part of the plans."
- Oklahoma City Code of Ordinances
This statement highlights the importance of working with professionals who take full accountability for design accuracy and compliance. For expert assistance with drainage system requirements, contact Arrowhead Roofing at (405) 235-6000 or visit their Edmond office at 321 W 18th St, Ste 160.
Conclusion
Oklahoma City’s roof drainage codes are in place to safeguard your property, ensure public safety, and minimize water damage risks. These regulations are crucial because effective drainage systems are essential for managing Central Oklahoma’s intense weather conditions, including heavy rainfall that can quickly overwhelm poorly designed systems. It’s clear that compliance with these codes is not just a legal requirement but a practical necessity.
Failing to meet these standards can lead to serious consequences, including hefty legal penalties. Beyond fines, inadequate drainage systems expose your property to structural damage, flooding issues, and potential complications with insurance claims. The codes mandate that roofs must be designed to handle the maximum depth of ponding water, even in scenarios where all primary drains are blocked. This ensures buildings are better equipped to handle extreme weather events.
Property owners are required to implement drainage systems capable of managing severe rainfall conditions – primary systems for 100-year storm events and secondary systems designed to handle rainfall rates of 10.2 inches per hour. These stringent standards reflect the intensity of Oklahoma’s storms and the necessity for backup measures to protect structures.
Additionally, all final drainage plans must be approved and sealed by a licensed Oklahoma Professional Engineer, underscoring the technical expertise required for compliance. Partnering with a qualified engineer and an experienced contractor is essential to meet these critical requirements.
For property owners in Oklahoma City and nearby areas, working with seasoned local contractors is vital. With nearly 40 years of experience in Central Oklahoma, Arrowhead Roofing understands the unique challenges posed by the region’s climate, local regulations, and manufacturer requirements. To ensure your drainage system meets code and your roof remains protected, reach out to them at (405) 235-6000 or visit their Edmond office at 321 W 18th St, Ste 160. By adhering to these regulations, you not only safeguard your property but also secure your investment and peace of mind.
FAQs
What is the difference between primary and secondary roof drainage systems in Oklahoma City?
In Oklahoma City, the primary roof drainage system is the main setup responsible for channeling rainwater off a roof and into the city’s stormwater system. These systems must follow detailed local drainage codes, which cover aspects like proper sizing, slope, and connection to an approved disposal point. To ensure everything is up to standard, both residential and commercial properties undergo thorough inspections.
The secondary roof drainage system serves as a backup, stepping in when the primary system becomes overwhelmed or when extra drainage is permitted by code. These systems often include additional downspouts or drains, designed to safely direct water to areas such as a yard or street. While they don’t have to meet the same strict hydraulic requirements as primary systems, they still play a key role in preventing problems like standing water or backflow.
When Arrowhead Roofing works on roofs in the Oklahoma City area, they make sure primary systems are fully compliant with city codes and secondary systems are properly installed to handle overflow. This approach helps protect your property while staying aligned with local regulations.
What are Oklahoma City’s roof drainage requirements for properties near floodplains?
In Oklahoma City, properties located within FEMA-designated floodplains must follow specific roof drainage codes to manage stormwater effectively. These codes aim to prevent increased flood levels and ensure stormwater flow isn’t disrupted. Roof runoff must be directed to an approved disposal point, such as a municipal stormwater system, detention basin, or another engineered outlet that aligns with the city’s standards.
Before beginning any construction, repairs, or modifications that affect roof drainage in a floodplain, you’ll need to secure a Floodplain Activity Permit. This permit ensures your project complies with Oklahoma City’s flood-control guidelines. Additionally, drainage systems must be designed to keep roof elevations above the base flood level, reducing the risk of water backing up into the structure.
Meeting these requirements can feel overwhelming, but experienced professionals like Arrowhead Roofing are here to help. With years of expertise in Oklahoma City, they can guide you through the process and ensure your roof drainage system adheres to local codes, keeping your property safe from potential flood damage.
What are the permit and inspection requirements for reroofing in Oklahoma City?
In Oklahoma City, a building permit is mandatory for any reroofing project – whether it’s for a single-family home, a multi-unit property, or a commercial structure. This requirement stems from the city’s adoption of the 2018 International Residential Code (IRC) for one- and two-family dwellings, which classifies reroofing as an alteration. Before you begin any work, you’ll need to secure this permit and schedule inspections at critical stages. These inspections typically include one after the underlayment and flashing are installed and another once the roofing materials are in place.
Moreover, components like gutters and downspouts must align with the city’s public-works standards. These standards, updated periodically by the City Engineer, are essential for ensuring compliance with local codes and avoiding complications later on.